Terms & Conditions

STANDARD DESIGNS

All standard designs include: 20° roof pitch, colorbond roof, gutters, fascias & downpipes. Prices based on brick veneer construction in metropolitan area, on a level site - Raft slab 100mm thick, reinforced with SL72 mesh and are subject to change without notice. Rendered facades, quoins and car accommodation not included unless noted in the price list.


PLEASE NOTE

All prices quoted on this website do not include: additional footings & siteworks, retaining walls, rock digging, removal of trees or removal of excess soil etc, light fittings, air conditioning, alarm system, window treatments, soft furnishings, irrigation system, pergolas, landscaping, paving, stormwater, floor coverings, tiling to verandah's / portico, fencing and sales related materials, prices may to be subject to change due to travel allowance.
Images contained in this site are for illustration purposes. Inclusions are subject to change without notice and whilst every endeavour is made to display standard product inclusions, display homes may contain items that are optional upgrades and priced accordingly.


House and Land Packages

* ©2013, Weeks Building Group ACN 008 087 278. The land referred to in this promotion is not owned by us. We make no representations about the suitability of the land to build on or otherwise. You must satisfy yourself of that by inspection or by taking professional advice or otherwise. To the extent permissible by law, all liability (whether in negligence or otherwise) for the information contained in this material or any representations regarding the land is disclaimed by Weeks Building Group ACN 008 087 278 and its related entities and businesses.

Price may vary depending on selections, engineering, council requirements & adjustments to allowances. Should retaining walls be required for your allotment, it is your responsibility to arrange with your adjoining neighbour(s) and obtain consent and/or approvals. No allowances for retaining walls have been included; retaining walls (if required) are to be completed by the purchaser of the land. The builder takes no responsibility nor is liable if retaining is required. All packages subject to final council approval.


Weekly repayment figures

* Warning. This rate applies only to the example given. Fees & charges will also be payable for any loan. The weekly repayment quote represents the initial repayment only on an interest only basis. The interest rate used to calculate weekly repayments is for secured loans on amounts of $250,000 or more. The interest rate used of 4.64% pa is the average initial 3 year fixed rate of a cross section of four major banks and/or lenders. This rate was determined at 14th April 2015 and is subject to variation.

Different amounts and terms will result in different terms & rates. Costs such as redraw fees or early repayment fees, and cost savings such as fee waivers, are not included in the rate but may influence the amount of the loan, the cost of obtaining it and the weekly repayment amount.